Areas of operation ~ Industry
Reliable partner in implementation of industrial projects

We have project expertise on various projects involving construction or systematic reuse.


Outokumpu Chrome Oy

  • Creation of the timetable for construction work needed for renewing the Tornio plant foundry and increasing the production
  • Creation of the timetable for the construction work required by increasing the production of the Kemi mine

Demolishing the pulp factory in Kemijärvi

  • We were responsible for the studies and measures needed to shut down and demolish the pulp factory a well as studies related to relocating the machinery and equipment.
  • The client was Stora Enso Oyj.
  • Pulp factory 250,000 ADt/a.
  • The assignment included project creation, planning control, procurement, worksite supervision and preparation of technical studies.

Arzamas corrugated cardboard factory, Russia 2005

  • Construction management, 2005
  • Roll storage extension: approximately 2,000 floor-m²
  • Client: Stora Enso Packaging Oy

Luhovits corrugated cardboard factory, Russia

  • Development expert tasks and design control, 2005-2006.
  • Implementation 2006-2008.
  • Total capacity approximately 30,000 floor-m²
  • Client: Stora Enso Packaging Oy

Komarom packaging plant, Hungary

  • Development expert tasks 2005-2006
  • First stage approximately 3,300 floor-m²
  • Client: Stora Enso Packaging Oy

Balabanovo plant for offset-printed packaging, Russia

  • Development and worksite management
  • Approximately 9,000 m2
  • Implementation 2006-2008.
  • Client: Stora Enso Packaging Oy

Finnsteve port terminal, Helsinki

Ahma Engineers Ltd. has worked as Finnsteve Oy Ab’s production management consultant for the construction project of the operational centre of Vuosaari port.

  • Our commission included construction management consultancy tasks, including planning control, procurement, contract control and worksite supervision.

The project’s key figures include:

  • Total area of buildings approximately 69,000 floor-m²
  • Total volume approximately 660,000 m3
  • Cost estimate ca. €60 million
  • Implementation 2006-2008

Arktos Group Oy, Kemijärvi

  • Gluelam beam factory and engineering works 2008-2009
  • Design and implementation of 10-kV electricity distribution, planning control, hardware and contracting projecting and worksite supervision