Ring
railway — New connection to Vantaa
and the airport
We were responsible for the tasks of the construction
contractor consultant, including project management, planning management,
procurement, contract management and site supervision.
The
customer was the Rail Department of the Finnish Transport Agency.
Key
figures:
-
Twin track passenger traffic track, 18 km long (including
8.1 km inside a tunnel)
- Maximum train speed 120 km/h
- 5 new train stations, 12 station reservations
- 33 bridges, including 12 rail bridges
- Street and road arrangements, 9 km
-
Parking facilities for 1550 vehicles and 950
bicycles
- Cost estimate €610 million
Rinteensilta,
Oulu
-
Renovating the 60-m bridge over the Nuoritta
river and a 3-km forest road
-
We were responsible for the design construction
and supervision.
-
The work was ordered by the City of Oulu, Technical
Department, Street and Greenscaping unit and the Road Administration.
Vuosaari
port, Helsinki
The port is the main point of export for
Finnish foreign trade. Our work included
project management, implementation tasks and site supervision. The work was
ordered by Port
of Helsinki.
Key
figures of the project:
-
The total surface area of the port is
about 150 ha, over 90 ha of which have been reclaimed from the sea for
construction.
- 50 ha business area
-
Almost 20 million m3 of digging,
excavation, dredging and landfill
-
Dredging and filling works can extend to depths
of over 30 metres
-
4000 m of quays consisting of a total of about 20
ship berths, depending on the of the vessels
- Modern loading and container processing equipment
- The project began in early 2003 and was completed in late
2008
- Total project costs almost €400 million
Improvement
of main road 170, Östersundom
-
A new bridge was built on main road 170 along
with a 600-m tyre bale section in the flood area in Östersundom.
-
This is the first time tyre bales have been used
to replace soil on a section this large in Finland.
-
We were responsible for tender documents and
construction project supervision.
-
The client was the Finnish Road Administration,
Uusimaa road district.
Improvement
of Ring Road I
-
The stops and lighting for the ramps on Ring Road
I were renewed between Malminkaari and Latokartanontie.
-
We were responsible for the design construction
and supervision.
-
The client was the Finnish Road Administration,
Uusimaa road district.
Improvement
of Itäväylä
-
On Itäväylä, the exit to Riskutie was improved
and equipped with traffic lights.
-
Noise barriers as well as pedestrian and bicycle paths
were built between Ring Road I and Riskutie.
-
We were responsible for the design construction
and supervision.
-
The client was the Finnish Road Administration,
Uusimaa road district.
Improvement
of road 9552
-
Road 9552 was improved between Kiistala and
Rouravaara.
-
We were responsible for the design construction
and supervision.
- The client was Agnico-Eagle Finland.
Kevitsa
mine road, Sodankylä
-
In order to make the mining operation possible, a
new road connection to the Kevitsa mining area was built in the village of Petkula.
-
The road length up to the end of the mine
concession is 7.6 km.
-
The new Valjusuvanto bridge, a three-span
prestressed concrete bridge, was built over the Kitisenjoki river.
-
A new reinforced concrete slab bridge was built
over the Mataraoja stream.
-
We were responsible for the design construction
and supervision.
- The client was Kevitsa Mining Oy.