We are responsible for the comprehensive
development of the Laivakangas mine project.
Key figures of the project:
-
Gold can be enriched with
natural methods.
-
The annual production is
approximately 4,000 kg of gold.
-
At this stage, 10,000 floor-m²
of buildings are made
-
Total investment
approximately €77 million
-
Delivery 2010–2011
-
The client is Nordic
Mines Ab.
Kittilä
mine, Kittilä
The mine in Kittilä is the largest known
gold deposit in Europe. Our commission
included the project and construction management tasks required for the opening
of the mine. The client was Agnico-Eagle
Finland.
Key
figures of the project:
- Ore for the concentration plant: 1 million tons per
year. Operating period: 12-15 years.
-
Annual excavations of the open pit mine (ore +
waste rock): 4.5 million tons per year (40 million tons in total).
-
Length of the open pit mine approximately 900 m,
maximum width 400 m and depth approximately 150 m.
- Earth removal: approximately 1 million m3.
-
Underground mine: access shaft to a
depth of about 400m from the surface, slope 1:7, dimensions 5 m x 5 m,
initial length about 3 km.
-
Construction of roads, buildings, ditches, pipe
systems, electricity distribution, etc. for the mine.
Pampalo
mine, Ilomantsi
-
Construction management of the mine, procurement
and worksite management, construction work supervision and monitoring of
hardware installation.
- The client was Endimines Oy.
Pahtavaara mine, Sodankylä
The
Pahtavaara gold mine opened in 1996.
The mining was restarted
in 2007, and excavation has moved from open pit to underground.
- Electrification projecting and design control